• Work Scheduled for 2021

    PAINTING

    SHMHA contracted with Roach Brothers to complete the 2021 paint schedule.  

    Residents will have to be more vigilant in removing items from their deck before the painter starts and providing water for power washing.  (If your entire building is being painted, you must delay awning installation).

     

    Entire Building, including deck:

     

    Sew. Hts. Dr.                Rolling Hills     Little Glen        Shady Lake       Trailside

    201-211, 301-311          202-208            101-111            102-116            101-107, 201-207, 301-311

                                                                                                                

    Deck Only:

     

    Sew. Hts. Dr.                WoodCrest             Timber Lane                 Timber Lane Ct.            Trailside

    802-812, 902-912,         101-111            505-507, 601-603                  104-106                        302-304

    1002-1012,                                               401-415            

    1202-1216

    Roof Replacement

    The buildings 402-412 and 601-611 SHD will be having roofs replaced by Penn-Ohio Roofing.

    Residents will be notified when the work will begin.

     

    Road Paving: This summer all of Timber Lane, Timber Lane Court and the service drive behind 505-507, 601-603 and 901-911 will be paved by Ellis Asphalt Paving.  Some driveways will also be completed.  We expect the work to be completed in June. If you are on the schedule, you will be notified about the work start date. Check your front door.